Customer & Plant
PGE Group & Budimex / Turow Power Plant
Solution
32 screw samplers for each ESP Hopper and Air Pre-Heaters
Material
Coal
Year
2019
Country
Polonia

For the new 450MW lignite fired utility unit at Turow, it was decided to extract an ash sample from the electrostatic precipitator. To obtain a final sample that represents the entire precipitator, it was decided to extract a sample from each of the 30 ESP hoppers and the two Air Pre-Heater hoppers.

The hoppers are constantly kept empty during operation and M&W JAWO Sampling proposed to design a screw sampler with material intake in the top and with minimal fabrication tolerances to collect even the smallest particles. To avoid restriction of the ash-outflow, the size of the samplers and their location was carefully selected. 32 screw samplers in total of two different types was delivered by M&W JAWO Sampling.

The Turow Power Plant is one of the oldest coal plants in Poland and has been operational since 1962. In 2014 a project for a new generating plant at Turow was initiated – a USD 870 million project expected to be completed in 2020.

PGE is Polands largest energy company with a production capacity of approx. 16 GW